Our Completed Projects

Walker Road Corridor Storm Sewer Outlet

 

Owner: City of Windsor
Scheduled: To be completed summer 2012
Consultant: RC Spencer Associates Inc.

Brief description of work:

  • Construction of 2100 mm storm sewer pipe from Walker Rd to Grand Marais Drain Outlet
  • To provide storm water outlet for the next phase of Walker Rd Reconstruction scheduled summer of 2012





South West Detention Centre, Windsor Ontario


Owner: Ontario Ministry of Community Safety and Correctional Services
Scheduled: Summer 2011
Contractor: Bondfield Construction Company Limited
Architect: NORR Ltd.

Brief description of work:

  • Construction of the new 315-bed facility in Windsor Ontario
  • Play field preparation, storm retention and storm water quality installations
  • Services include site works, sewers ,watermains excavation and backfilling of buildings and Parking lots




CS Wind


Owner: Rosati Group
Civil Engineer: Aleo and Associates
Purpose: Windmill Component Production Building Expansion and yard storage for heavy equipment and loadings

Brief description of work:

  • Supply and install underground site servicing of: Watermain and firemain, Storm sewer system including water treatment quality units, Sanitary sewer system
  • Excavate, haul and dispose clay off-site including proof rolling of subbase
  • Supply, place, compact, and grading for approximately 4 hectare of granular material




 


DRIC, Windsor Essex Parkway, Parkway Infrastructure Constructors- Enwin Duct installation for use in the Design and Build of the Windsor Essex Parkway in Windsor,ON

 

Owner: Infrastructure Ontario, Ontario Ministry of Transportation
Scheduled: To be completed spring 2012
Prime Contractor: Parkway Infrastructure Constructors, with Windsor Essex Mobility Group

Brief description of work:

  • Construction of the Duct bank and Utility Chambers for use by Enwin Utilities for installation of power sources and streetlights used in the Design and build of the Windsor Essex Parkway
  • This 36 conduit stack will provide all the electrical space required for final electrical, traffic and communication installations
  • This Utility corridor is installed prior to final road and structures being constructed





Albuna Water Tower – Site Works, Kingsville, Ontario


Owner: Ontario Clean Water Agency
Scheduled: Spring/Summer 2011
Value:
Consultant: Landmark Structures

Brief description of work:

  • Supply and installation of reinforced concrete high pressure watermain
  • Sanitary sewer services
  • Grading
  • Overflow detention pond
  • Access road and driveway
  • Landscaping and restoration




Road Rehab II and IV


Owner: Corporation of the City of Windsor
Scheduled: Summer 2011
Value: $3.0 Million
Consultant: City of Windsor

Brief description of work:

  • Full reconstruction of the existing pavements, adjacent residential sidewalks and driveways, and the restoration of boulevard areas
  • Construction of watermains including the transfer of existing water services, in conjunction with pavement reconstruction
  • Directional drilling of watermains in specified areas of job




Walker Road / Wyandotte Street East, Intersection Improvements


Owner: Corporation of the City of Windsor
Scheduled: Summer 2010
Value: $3.3 Million
Consultant: Dillon Consulting Ltd.

Brief description of work:

  • Installation of Storm Sewers
  • Rehabilitation of Combined Sewers
  • Installation of Watermain
  • Construction of Concrete Road Pavement and Sidewalks
  • Traffic Signal Infrastructure and Streetlighting



 


Laurier Parkway Extension – Malden Road to Howard Avenue


Owner: Town of LaSalle
Scheduled: Summer 2010
Value: $10.1 Million
Consultant: Dillon Consulting Ltd.

Brief description of work:

  • Road Construction with Asphalt Paths
  • Storm Sewers
  • Roadside Ditches
  • Sanitary Sewer
  • Watermains
  • Traffic Signals and Street Lighting
  • Restoration




Westcott Road Rehabilitation


Owner: City of Windsor
Scheduled: Summer 2010
Value: $1.7 Million
Consultant: RC Spencer Associates Inc.

Brief description of work:

  • Removal of existing pavement
  • Excavation and grading
  • Sanitary sewers
  • Storm sewers
  • Watermains
  • Concrete sidewalks
  • New roadway pavement
  • Restoration



Riverdale Avenue Watermain Reconstruction


Owner: Windsor Utilities Commision
Scheduled:
Value: $0.3 Million
Consultant: Windsor Utilities Commision

Brief description of work:

  • Installation of Watermain and services
  • Road and boulevard restoration



 


2014 Walkerville BIA project

J&J Lepera is proud to have completed the Wyandotte St. East re-construction project on time and on budget.

Click here for complete article


Current Projects

Subcontractors to Parkway Infrastructure Constructors in building of the Rt. Hon. Herb Gray Parkway being delivered by the Ministry of Transportation (MTO) and Infrastructure Ontario.

  • Underground utility conduit installations on behalf of Enwin Utilities
  • Installations of Reinforced Earth wall systems by RECO
  • Installations of Terrafort MSE retaining wall systems by Terrafix
  • Installations of Retaining wall systems by Maccaferri, and Nilex
  • Installations of Geospec fill materials by Plasti-Fab EPS Product Solutions
  • Supply and install concrete pressure pipes for force-main work in pump stations

Click here for complete project details